Palm Beach County Logo, link to home page
 
Public Affairs  Publications  FAQ  Government  About Us
 

Links

 
 

Roads & Construction

 
City of West Palm Beach Road Construction Information
The link above provides daily road construction updates for the City of West Palm Beach. For more information dial 822-4636.
Information is also available on-line at
www.smartraveler.com 
To view real-time video of I-95 in Palm Beach County, visit the FDOT I-95 Interim Traffic Management System (ITMS) website at
www.palmbeachcotraffic.org
These free services are provided by FDOT and the SunGuide™ Partners. For updated lane closure information, please refer to
www.pbfdot.com

PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF
ROAD AND BRIDGE CONSTRUCTION LIST


DATE OF ISSUE: AUGUST 25, 2010

STATUS FOR AUGUST 30, 2010 THROUGH SEPTEMBER 5, 2010


*** CONSTRUCTION WORK ZONES ADDED OR CHANGED ***
*** SINCE LAST REPORT ***


1. LOCATION: Haverhill Rd. from Elmhurst Rd. to Okeechobee Blvd. (west of the City of West Palm Beach)

DESCRIPTION: Milling and paving.

RESTRICTIONS: There will be lane closures.


2.LOCATION: Wallis Rd. from Haverhill Rd. to Caroline Ave. (west of the City of West Palm Beach)

DESCRIPTION: Milling and paving.

RESTRICTIONS: There will be alternating traffic by the use of flaggers.


*** UNCHANGED CONSTRUCTION WORK ZONES ***

3. LOCATION: Military Trail from Clint Moore Rd. to Lake Worth Rd. (City of Boca Raton, City of Delray Beach, City of Boynton Beach and City of Atlantis)

DESCRIPTION: Milling, paving, handicapped ramps, signal loops and pavement markings.

RESTRICTIONS: Lane closures are possible from Hypoluxo Rd. to Lake Worth Rd. for northbound and southbound.


4. LOCATION: Okeechobee Blvd. from Ponce De Leon St. west to the M-1 canal (Village of Royal Palm Beach)

DESCRIPTION: Installation of a 36” water main.

RESTRICTIONS: The right turn lanes west of Royal Palm Beach Blvd. will remain closed. The right lane will be closed eastbound just west of Wildcat Way.


5. LOCATION: Duda Rd. from CR 880 south one mile (City of Belle Glade)

DESCRIPTION: Pavement markings

RESTRICTIONS: There will be alternating traffic by the use of flaggers.


6. LOCATION: Alt. A1A (SR 811) from Donald Ross Rd. to Center St. (Town of Jupiter)

DESCRIPTION: Reconstruction of 4 lane divided roadway to 6 lane divided roadway.

RESTRICTIONS: There will be intermittent lane closures from 9:00 A.M. to 3:00 P.M., Monday through Friday. The sidewalk will be closed on Alt. A1A from 500 ft. north of Toney Penna Drive to Indiantown Rd.


7. LOCATION: 45th St. from east of Haverhill Rd. to Jog Rd. (City of West Palm Beach)

DESCRIPTION: Existing 2-lane to 4-lane divided, including a new bridge over the Turnpike.

RESTRICTIONS: Lane closures are expected east of Haverhill Rd. on 45th St., both east and westbound, from 9:00 A.M. to 3:00 P.M. Construction trucks will be entering the roadway at this location.


8. LOCATION: West Sugarhouse Rd. from Gator Blvd. to S.R. 80 (City of Belle Glade)

DESCRIPTION: Pavement Markings

RESTRICTIONS: There will be alternating traffic by the use of flaggers.


9. LOCATION: Sansbury’s Way and Process Drive (east of the Village of Royal Palm Beach)

DESCRIPTION: Paving, drainage, curb and sidewalks.

RESTRICTIONS: Periodic lane closures will occur on Process Drive and Sansbury’s Way.


10. LOCATION: Congress Ave. from Lantana Rd. to south of Melaleuca Lane (City of Atlantis)

DESCRIPTION: Existing 4 lane divided roadway is being rebuilt to a 6-lane divided roadway including drainage, water, sewer, sidewalks, paving and bridge widening.

RESTRICTIONS: There will be lane closures from 9:00 P.M. to 7:00 A.M. Monday through Friday.


11. LOCATION Okeechobee Blvd. from Seminole Pratt Whitney Rd. to east of Crestwood Blvd. (Village of Royal Palm Beach and Town of Loxahatchee Groves)

DESCRIPTION: Underground utility work.

RESTRICTIONS: There will be eastbound lane closures with flaggers to control traffic from 9:00 A.M. to 3:00 P.M.


12. LOCATION: Seacrest Blvd. from S.W. 3rd Ave. to the Boynton Beach Canal (City of Boynton Beach)

DESCRIPTION: Milling, Paving, adding islands and landscaping.

RESTRICTIONS: There will be lane closures Monday through Friday 8:00 A.M. to 5:00 P.M.


13. LOCATION: George Bush Blvd. Bridge over the Intracoastal Waterway (City of Delray Beach)

DESCRIPTION: Bridge rehabilitation.

RESTRICTIONS: The bridge will be closed to all traffic including pedestrians from 6:00 A.M. on July 20, 2010, and will remain closed through December 13, 2010, at 6:00 P.M. Traffic will be detoured via: A1A, E. Atlantic Ave. and U.S. #1/Federal Hwy. Access to all businesses will be maintained.


14. LOCATION: Okeechobee Blvd. from Royal Palm Beach High School to east of the Florida Turnpike (Village of Royal Palm Beach and City of West Palm Beach)

DESCRIPTION: Construction of an 8-lane divided road from the existing 6-lane.

RESTRICTIONS: There will be lane closures Monday through Friday from 9:00 A.M. to 3:00 P.M. There will be lane closures also during the night from 8:00 P.M. to 5:00 A.M., Sunday through Thursday during milling and paving.


15. LOCATION: Hypoluxo Rd. from Jog Rd. to Military Trail (west of the City of Boynton Beach)

DESCRIPTION: Construction of a 6-lane divided roadway from the existing 4-lanes.

RESTRICTIONS: There will be periodic lane closures westbound Monday through Friday 9:00 A.M. to 3:00 P.M. The eastbound right lane will be closed from the E-3 canal to west of Military Trail.


16. LOCATION: Lyons Rd. from Glades Rd. to Yamato Rd. (west of the City of Boca Raton)

DESCRIPTION: Construction of a 6-lane divided roadway from the existing 4-lanes.

RESTRICTIONS: There will be lane closures north and southbound Monday through Friday from 9:00 A.M. to 3:00 P.M.


Provided and Maintained by Public Affairs.
Tel: 561-355-2754  Fax: 561-355-3819
301 N. Olive Avenue, Suite 1102, P.O. Box 1989
West Palm Beach, FL 33402-1989
 

News

 
 

Public Affairs Directory