PALM BEACH COUNTY TRAFFIC DIVISION UPDATE OF ROAD AND BRIDGE CONSTRUCTION LIST
DATE OF ISSUE: AUGUST 25, 2010
STATUS FOR AUGUST 30, 2010 THROUGH SEPTEMBER 5, 2010
*** CONSTRUCTION WORK ZONES ADDED OR CHANGED ***
*** SINCE LAST REPORT ***
1. LOCATION: Haverhill Rd. from Elmhurst Rd. to Okeechobee Blvd. (west of the City of West Palm Beach)
DESCRIPTION: Milling and paving.
RESTRICTIONS: There will be lane closures.
2.LOCATION: Wallis Rd. from Haverhill Rd. to Caroline Ave. (west of the City of West Palm Beach)
DESCRIPTION: Milling and paving.
RESTRICTIONS: There will be alternating traffic by the use of flaggers.
*** UNCHANGED CONSTRUCTION WORK ZONES ***
3. LOCATION: Military Trail from Clint Moore Rd. to Lake Worth Rd. (City of Boca Raton, City of Delray Beach, City of Boynton Beach and City of Atlantis)
DESCRIPTION: Milling, paving, handicapped ramps, signal loops and pavement markings.
RESTRICTIONS: Lane closures are possible from Hypoluxo Rd. to Lake Worth Rd. for northbound and southbound. 4. LOCATION: Okeechobee Blvd. from Ponce De Leon St. west to the M-1 canal (Village of Royal Palm Beach)
DESCRIPTION: Installation of a 36” water main.
RESTRICTIONS: The right turn lanes west of Royal Palm Beach Blvd. will remain closed. The right lane will be closed eastbound just west of Wildcat Way.
5. LOCATION: Duda Rd. from CR 880 south one mile (City of Belle Glade)
DESCRIPTION: Pavement markings
RESTRICTIONS: There will be alternating traffic by the use of flaggers.
6. LOCATION: Alt. A1A (SR 811) from Donald Ross Rd. to Center St. (Town of Jupiter)
DESCRIPTION: Reconstruction of 4 lane divided roadway to 6 lane divided roadway.
RESTRICTIONS: There will be intermittent lane closures from 9:00 A.M. to 3:00 P.M., Monday through Friday. The sidewalk will be closed on Alt. A1A from 500 ft. north of Toney Penna Drive to Indiantown Rd.
7. LOCATION: 45th St. from east of Haverhill Rd. to Jog Rd. (City of West Palm Beach)
DESCRIPTION: Existing 2-lane to 4-lane divided, including a new bridge over the Turnpike.
RESTRICTIONS: Lane closures are expected east of Haverhill Rd. on 45th St., both east and westbound, from 9:00 A.M. to 3:00 P.M. Construction trucks will be entering the roadway at this location.
8. LOCATION: West Sugarhouse Rd. from Gator Blvd. to S.R. 80 (City of Belle Glade)
DESCRIPTION: Pavement Markings
RESTRICTIONS: There will be alternating traffic by the use of flaggers.
9. LOCATION: Sansbury’s Way and Process Drive (east of the Village of Royal Palm Beach)
DESCRIPTION: Paving, drainage, curb and sidewalks.
RESTRICTIONS: Periodic lane closures will occur on Process Drive and Sansbury’s Way.
10. LOCATION: Congress Ave. from Lantana Rd. to south of Melaleuca Lane (City of Atlantis)
DESCRIPTION: Existing 4 lane divided roadway is being rebuilt to a 6-lane divided roadway including drainage, water, sewer, sidewalks, paving and bridge widening.
RESTRICTIONS: There will be lane closures from 9:00 P.M. to 7:00 A.M. Monday through Friday.
11. LOCATION Okeechobee Blvd. from Seminole Pratt Whitney Rd. to east of Crestwood Blvd. (Village of Royal Palm Beach and Town of Loxahatchee Groves)
DESCRIPTION: Underground utility work.
RESTRICTIONS: There will be eastbound lane closures with flaggers to control traffic from 9:00 A.M. to 3:00 P.M.
12. LOCATION: Seacrest Blvd. from S.W. 3rd Ave. to the Boynton Beach Canal (City of Boynton Beach)
DESCRIPTION: Milling, Paving, adding islands and landscaping.
RESTRICTIONS: There will be lane closures Monday through Friday 8:00 A.M. to 5:00 P.M.
13. LOCATION: George Bush Blvd. Bridge over the Intracoastal Waterway (City of Delray Beach)
DESCRIPTION: Bridge rehabilitation.
RESTRICTIONS: The bridge will be closed to all traffic including pedestrians from 6:00 A.M. on July 20, 2010, and will remain closed through December 13, 2010, at 6:00 P.M. Traffic will be detoured via: A1A, E. Atlantic Ave. and U.S. #1/Federal Hwy. Access to all businesses will be maintained.
14. LOCATION: Okeechobee Blvd. from Royal Palm Beach High School to east of the Florida Turnpike (Village of Royal Palm Beach and City of West Palm Beach)
DESCRIPTION: Construction of an 8-lane divided road from the existing 6-lane.
RESTRICTIONS: There will be lane closures Monday through Friday from 9:00 A.M. to 3:00 P.M. There will be lane closures also during the night from 8:00 P.M. to 5:00 A.M., Sunday through Thursday during milling and paving.
15. LOCATION: Hypoluxo Rd. from Jog Rd. to Military Trail (west of the City of Boynton Beach)
DESCRIPTION: Construction of a 6-lane divided roadway from the existing 4-lanes.
RESTRICTIONS: There will be periodic lane closures westbound Monday through Friday 9:00 A.M. to 3:00 P.M. The eastbound right lane will be closed from the E-3 canal to west of Military Trail.
16. LOCATION: Lyons Rd. from Glades Rd. to Yamato Rd. (west of the City of Boca Raton)
DESCRIPTION: Construction of a 6-lane divided roadway from the existing 4-lanes.
RESTRICTIONS: There will be lane closures north and southbound Monday through Friday from 9:00 A.M. to 3:00 P.M.
|